GRID-SERVING BATTERY STORAGE FOR REGIONAL GRID REQUIREMENTS
As experts in the battery storage market, we understand the needs of grid operators and also take regional grid requirements into account.
WORKING WITH GRID OPERATORS: FIRST FCA AND REGIOlink IN LIVE OPERATION
In collaboration with grid operators, green flexibility is putting the first Flexible Connection Agreement (FCA) into practice. With REGIOlink, we are developing a regionally coordinated operating strategy based on actual grid requirements. This approach enables flexible grid connection solutions that reduce pressure on the grid, provide greater planning certainty, and support the integration of renewable energy.
SHORT STUDY
Impact of Grid Operator Requirements on the Operation of Large-Scale Battery Storage
CONCEPT
REGIOlink for Regional Grid Connection of Large-Scale Battery Storage
PARTNERSHIP
Municipal Utilities and Energy Suppliers as Partners for Joint Projects
FCA BLUEPRINT
In Collaboration with Grid Operators: 12 Months of Grid-Neutral Battery Storage Operation — An FCA Blueprint from Real-World Experience

IMMENSTADT – GERMANY’S FIRST GRID-NEUTRAL BATTERY STORAGE SYSTEM
With the Immenstadt project, green flexibility, together with Allgäuer Überlandwerke (AÜW), is developing Germany’s first grid-neutral large-scale battery storage system. From the outset, the project has been planned in close coordination with the local grid operator, AllgäuNetz, and designed to meet the specific requirements of the regional grid.
The objective is to operate the battery not only with a focus on economic performance, but also with the local grid situation in mind, actively contributing to grid stability.
The project serves as a reference for implementing grid-supportive operating strategies in real-world operation. It demonstrates how large-scale battery storage can be integrated into regional distribution grids as a flexible asset — transparently, in close coordination with grid operators, and with a long-term operational perspective.

Volker Wiegand
Managing Director AllgäuNetz
With the concept of the temporary regional grid support of green flexibility, we try to reduce bottlenecks in our grid and adapt the battery storage system specifically to the requirements of regional grids.
COOPERATION WITH VWEW-ENERGIE
Together with VWEW-energie, green flexibility is implementing another project based on a Flexible Connection Agreement (FCA) within the distribution grid. With a power output of 10 MW and a storage capacity of 25 MWh, the project was developed from the outset as a collaborative solution between the grid operator and the battery storage operator.
The project is based on the REGIOlink concept, which enables a flexible, regionally coordinated operating strategy. Instead of applying rigid power limitations, the battery storage system is dynamically adapted to the prevailing grid conditions. This creates a solution that addresses both the grid’s technical requirements and the economic considerations of battery storage operation.

OUR SOLUTIONS FOR GRID OPERATORS
green flexibility develops, builds, and operates large-scale battery storage systems in close collaboration with grid operators. Our focus is on grid-supportive operating strategies, flexible grid connection solutions, and long-term partnerships.
Flexible Connection Agreements (FCA)
Regional operating strategies with REGIOlink
Joint grid analysis and coordinated operation
Long-term operation by an experienced battery storage operator
With the REGIOlink model, green flexibility has developed a practice-oriented concept for the regional grid-supporting operation of large-scale battery storage systems. While terms such as “grid-supportive” or “grid-neutral” are currently under discussion, there is often a lack of a uniform and clear regulatory definition.
REGIOlink - THE CONNECTION OF STORAGE AND GRID

Häufig gestellte Fragen
Does battery storage put additional strain on the grid?
What is a Flexible Connection Agreement (FCA)?
How does battery storage affect grid load?
Who controls the battery storage system during operation?
How does collaboration with the grid operator work?